|

unShaken in Timor

Yes… on 27.05.2022, around 11:30 am, there was another earthquake in Timor… but it was the first one here!

I was in the house in Gleno… It was such a weird feeling, cause it lasted more than the one in Australia (my only other experienced comparison). At first, I thought I was dizzy cause it looked like the room was moving, but because it lasted more, and came in two waves… I realized what it was: an earthquake.

Luke was in the car in Dili, “the suspension took most of it so all I felt was some car rocking, like one or two people shaking the car side to side. Shaken, not stirred!” he said.

The quake occurred at a depth of 10km and struck about 29km East-South-east of Lospalos. There are no reports of life loss. Praise God!

We all react differently, in moments of uncertainty, but when founded on the Rock, we remain unshaken.

Love, L&A

Similar Posts

  • |

    Building Progress 2023

    Our Shipping Container Residence Dear readers, It has been some time since we commenced construction of the residence. Regular readers will know we paused the building to do some much-needed erosion mitigation to the property’s northern boundary. With that critical task behind us, we’re excited to share updates on the residence. The residence is designed…

  • |

    Fig Tree Seedlings

    Yesterday we brought home approximately 100 fig tree seedlings.. Luke messaged a stranger at the time, and later met with Julio – a Timorese man passionate about fig trees and the development of his country. The majority of the seedlings will be given to the community in Gleno and Julio will give them training on…

  • Back…

    Dear Readers and Fellow Time-Travelers, Prepare for a double take, for we find ourselves once again in the enchanting land of Timor-Leste! But amidst this return, I’ve got a confession to make: while going through our blog, I noticed a few amazing stories and pictures that somehow slipped through the cracks of time. But fear…

  • |

    Shipping Containers x4

    Although the road needed fixing, meetings and discussions were held with the chefe-suco, who in turn talked to the relevant land owners… but after all that, four 20ft shipping containers were delivered to the site. The preparation for the foundations has also started and a gallery showing the delivery and the progress of the works…