unShaken in Timor

Yes… on 27.05.2022, around 11:30 am, there was another earthquake in Timor… but it was the first one here!

I was in the house in Gleno… It was such a weird feeling, cause it lasted more than the one in Australia (my only other experienced comparison). At first, I thought I was dizzy cause it looked like the room was moving, but because it lasted more, and came in two waves… I realized what it was: an earthquake.

Luke was in the car in Dili, “the suspension took most of it so all I felt was some car rocking, like one or two people shaking the car side to side. Shaken, not stirred!” he said.

The quake occurred at a depth of 10km and struck about 29km East-South-east of Lospalos. There are no reports of life loss. Praise God!

We all react differently, in moments of uncertainty, but when founded on the Rock, we remain unshaken.

Love, L&A

Similar Posts

  • Mechanical Setbacks

    Today the project’s truck was coming out of the mechanic after 6 months of “intensive care” and we were going back to Gleno to finally get a quote for the container residence … but I guess we still needed to learn to be ready for surprises.. cause although only one third into our 1.30h trip,…

  • |

    The Goal of this Trip

    ok.. so we’re in Gleno… but why? Our volunteer work here is to design and raise a radio tower, and also to organise the construction of a residence / area where the locals can come and learn about agriculture and a better lifestyle- VIVA MELHOR; in 2013 an estimated 90,000 children under 5, or 50percent, suffered…

  • |

    Finally: get to work!

    After purchasing the land we thought that the first priority would be to have the much needed water for our daily needs., as well as for the irrigation of our vegetable garden and fruit trees. We are worried, also, to ensure the supply of drinking water to the local population of the village of Hlalameta, avoiding your displacement…

  • |

    My Key!

    This morning before I began walking from our rental house out to the building site where we are building the community center, I locked the door to our rental house and carefully put the key in my pocket as I began down the dusty road. “Dusty” is key (pun intended!) because anything small that lands…

  • | |

    Septic Tank

    Since the beginning of May 2022, we have been working tirelessly on the septic tank project. It has been quite the journey, considering the numerous challenges we faced and the fact that all the excavation work was done by hand. Surprisingly, the digging was completed in just about two weeks, which is quite impressive when…